Construction glossary
The building trades use many technical terms and acronyms, often specific to France. Here is what they mean, in a few words. The French term is given in brackets.
| Term | Definition |
|---|---|
| Accessibility (ERP) | Obligation for premises open to the public to be usable by people with disabilities: entrance, circulation, toilets, signage. |
| AMO — client-side project management (assistance à maîtrise d’ouvrage) | Advisory assignment that helps the project owner define the project, choose providers and monitor the budget. |
| Construction broker (courtier en travaux) | Intermediary who puts a client in touch with building contractors. |
| Contract amendment (avenant) | Change to a signed works contract, for example to add works or change a price. |
| Critical path (chemin critique) | Sequence of tasks in a schedule that cannot slip without delaying the end of the works. |
| DTU (document technique unifié) | French set of rules describing how to carry out a given type of works correctly. |
| Engineering firm (BET, bureau d’études techniques) | Engineers who design and size a technical system: structure, heating, electricity… |
| General contractor (contractant général) | Company that takes charge of an entire project, from design to construction, for an overall price. |
| Good building practice (règles de l’art) | The recognised good practices of a trade. |
| Handover (réception) | Formal acceptance of the works by the client, with or without snags. It starts the legal guarantee periods. |
| Interim payment application (situation de travaux) | Interim invoice from a contractor, based on progress on site. |
| Latent defect (désordre) | Defect that appears in a building after the works: cracks, leaks, detachment… |
| Local urban plan (PLU, plan local d’urbanisme) | Municipal document setting the planning and building rules in each area of the town. |
| Occupied site (site occupé) | Works carried out in premises that remain in use during the works. |
| OPC — scheduling, management and coordination (ordonnancement, pilotage et coordination) | Assignment that organises the site schedule and coordinates contractors. |
| Poor workmanship (malfaçon) | Work that is badly executed, not compliant with good building practice or the contract. |
| Pre-handover inspection (OPR, opérations préalables à la réception) | Inspection of the works before handover, to identify defects. |
| Prior declaration of works (DP, déclaration préalable) | Simplified planning application filed at the town hall, required for certain works such as changes to a façade or a shopfront, or for a change of use. |
| Project brief (programme) | Document describing the client’s needs: areas, uses, constraints, budget. |
| Project manager (MOE, maître d’œuvre) | The professional who designs the project and directs the works, often an architect. |
| Project owner (MOA, maître d’ouvrage) | The person or company that commissions and pays for the works: the client. |
| Public tender (appel d’offres) | Procedure in which a client puts several contractors in competition to carry out works. |
| Snags (réserves) | Defects recorded at handover, which the contractor must fix. |
| Specifications (cahier des charges) | Document that describes exactly what the client expects from the project. |
| State heritage architect (ABF, architecte des Bâtiments de France) | State official who reviews works in protected areas around historic monuments. |
| Trade (corps de métier) | A building specialism: masonry, plumbing, electricity, painting… |